AETEC
AETEC · Nomex Assembly StudioABB PoWa 20 · Assembly · Inspect · Dispense
AETEC ENGINEERING

Supported assembly. Inspection before adhesive.

1,000 mm grid · 50 mm pitch · 400 cells
Loading the ABB PoWa 20 model…
AETEC · CONCEPT DESIGN
Geometry checkChecking report…
InspectionAwaiting assembly
Adhesive0 / 441 points
Fixture coversStowed
01
Separate and support

Pick one flexible strip while supporting its full length.

A 0/21 · B 0/21Illustrative sequence time
01 · END EFFECTOR

Grip the intact paper land

A full-length beam supports segmented vacuum pads and soft jaws. Separate end clamps apply limited tension. The upper support modules stay between crossing walls and lift clear after handover.

02 · FIXTURE

One datum. One floating end.

Each strip has an independent spring carriage with preload adjustment, a stroke stop and tension confirmation. Retractable combs limit local bow. Low carrier rails continue to support the core after the combs lower.

03 · ADHESIVE

Inspect, then select the glue route

Four overhead cameras check the complete grid; the selected adhesive head carries a laser profiler for seating height. Spray requires all four fixture shields closed. Drip addresses each intersection and uses no deployed shield. The core remains supported through qualified cure.